01
New ConstructionWhen this path may be stronger
New construction may be stronger when the required program and performance cannot be achieved coherently by retaining the existing building.
- Documented structural, envelope, system, or layout constraints would leave major goals unresolved after an extensive renovation.
- Current site and jurisdiction review supports a replacement concept without relying on unconfirmed development assumptions.
- A whole-building approach to orientation, circulation, structure, energy, and systems is central to the project goal.
- The owner is prepared for demolition review, site work, temporary housing, and the broader design and approval path.
